Newly erected glulams and stone wall looking great on a sunny site visit.
Portanure House, Loch Gowna
Aluminium frames have been installed and the windows are going in at Portanure House, Loch Gowna. The old field stone wall is being built, with first-fix plumbing and electrics next to commence.
site visit, carnaughliss house, nuttscorner
Ground floor precast slabs have now been installed with steel frame due to be erected next week.